{"id":25598,"date":"2024-05-09T18:19:39","date_gmt":"2024-05-09T11:19:39","guid":{"rendered":"https:\/\/letienhung.com\/?p=25598"},"modified":"2024-06-09T13:44:42","modified_gmt":"2024-06-09T06:44:42","slug":"nut-giao-an-phu-3-400-ti-hien-dai-nhat-tp-hcm","status":"publish","type":"post","link":"https:\/\/letienhung.com\/en\/nut-giao-an-phu-3-400-ti-hien-dai-nhat-tp-hcm\/","title":{"rendered":"How is the 3,400 billion An Phu intersection, the most modern in Ho Chi Minh City?"},"content":{"rendered":"<h2 class=\"detail-sapo\" data-role=\"sapo\">An Phu intersection is a key project of Ho Chi Minh City built with a scale of 3 floors, including underground tunnels, overhead bridges connecting Ho Chi Minh City - Long Thanh - Dau Giay expressway and major roads.<\/h2>\n<figure id=\"attachment_25599\" aria-describedby=\"caption-attachment-25599\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-25599 size-full\" src=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/base64-171305601160512308371.webp\" alt=\"\" width=\"1100\" height=\"728\" srcset=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/base64-171305601160512308371.webp 1100w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/base64-171305601160512308371-300x199.webp 300w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/base64-171305601160512308371-1024x678.webp 1024w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/base64-171305601160512308371-150x99.webp 150w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/base64-171305601160512308371-768x508.webp 768w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><figcaption id=\"caption-attachment-25599\" class=\"wp-caption-text\">An Phu intersection begins construction at the end of 2022, with the most modern design in Ho Chi Minh City - Photo: CHAU TUAN<\/figcaption><\/figure>\n<p class=\"\">At the survey of An Phu intersection on April 12, Chairman of Ho Chi Minh City People&#039;s Committee Phan Van Mai asked the Management Board of Investment and Construction Projects of Ho Chi Minh City traffic works to speed up progress and soon put the project into operation. put into operation to serve the people.<\/p>\n<p class=\"\">Mr. Mai agreed to assign the People&#039;s Committee of Thu Duc City to preside, research and propose a suitable plan, architecture and location to build the central tower at An Phu intersection.<\/p>\n<p class=\"\">According to the Management Board of Ho Chi Minh City Traffic Construction Investment Projects (investor), An Phu intersection will start construction at the end of 2022 and is expected to be completed on April 30, 2025. This project has an investment of up to 3,400 billion VND and is considered the most modern intersection in Ho Chi Minh City.<\/p>\n<p class=\"\">The previously reported design options for the 3-storey intersection will basically remain the same. As for the scale and location of the tower in the center named &quot;Aspiration&quot;, the design plan needs to be recalculated to be commensurate with the scale of the intersection and the symbol of Thu Duc City.<\/p>\n<h2 class=\"\">Perspective of An Phu intersection after completion:<\/h2>\n<figure id=\"attachment_25600\" aria-describedby=\"caption-attachment-25600\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-25600 size-full\" src=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/sfsfg-17130241061321246973101.webp\" alt=\"An Ph\u00fa - n\u00fat giao th\u00f4ng quan tr\u1ecdng \u0111\u1eb7c bi\u1ec7t \u1edf c\u1eeda ng\u00f5 ph\u00eda \u0111\u00f4ng TP.HCM - l\u00e0 \u0111i\u1ec3m \u0111\u1ea7u tuy\u1ebfn cao t\u1ed1c TP.HCM - Long Th\u00e0nh - D\u1ea7u Gi\u00e2y k\u1ebft n\u1ed1i v\u1edbi nh\u1eefng \u0111\u01b0\u1eddng tr\u1ee5c ch\u00ednh nh\u01b0 Mai Ch\u00ed Th\u1ecd, L\u01b0\u01a1ng \u0110\u1ecbnh C\u1ee7a, \u0110\u1ed3ng V\u0103n C\u1ed1ng - \u0110\u1ed3 h\u1ecda: CH\u00c2U TU\u1ea4N\" width=\"1100\" height=\"723\" srcset=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/sfsfg-17130241061321246973101.webp 1100w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/sfsfg-17130241061321246973101-300x197.webp 300w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/sfsfg-17130241061321246973101-1024x673.webp 1024w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/sfsfg-17130241061321246973101-150x99.webp 150w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/sfsfg-17130241061321246973101-768x505.webp 768w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><figcaption id=\"caption-attachment-25600\" class=\"wp-caption-text\">An Phu - a particularly important intersection at the eastern gateway of Ho Chi Minh City - is the starting point of the Ho Chi Minh City - Long Thanh - Dau Giay expressway connecting with main roads such as Mai Chi Tho, Luong Dinh Cua, Dong Van Cong \u2013 Graphics: CHAU TUAN<\/figcaption><\/figure>\n<figure id=\"attachment_25601\" aria-describedby=\"caption-attachment-25601\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-25601 size-full\" src=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52762523978250964359fe918ddba789221cbef5011a0-1-1713024217470400088265.webp\" alt=\"\" width=\"1100\" height=\"619\" srcset=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52762523978250964359fe918ddba789221cbef5011a0-1-1713024217470400088265.webp 1100w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52762523978250964359fe918ddba789221cbef5011a0-1-1713024217470400088265-300x169.webp 300w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52762523978250964359fe918ddba789221cbef5011a0-1-1713024217470400088265-1024x576.webp 1024w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52762523978250964359fe918ddba789221cbef5011a0-1-1713024217470400088265-150x84.webp 150w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52762523978250964359fe918ddba789221cbef5011a0-1-1713024217470400088265-768x432.webp 768w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><figcaption id=\"caption-attachment-25601\" class=\"wp-caption-text\">An Phu intersection has 3 floors including a two-way underpass connecting Ho Chi Minh City - Long Thanh - Dau Giay expressway with Mai Chi Tho street (Thu Thiem tunnel side), the underpass extends through the Mai Chi Tho - Dong Van intersection Cong \u2013 Photo: Management Board of Investment and Construction Projects for Ho Chi Minh City Transport Works<\/figcaption><\/figure>\n<figure id=\"attachment_25602\" aria-describedby=\"caption-attachment-25602\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-25602 size-full\" src=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325361490d20abc59b3d26e777239e831936f1833-1-1713024217476984589771.webp\" alt=\"\" width=\"1100\" height=\"619\" srcset=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325361490d20abc59b3d26e777239e831936f1833-1-1713024217476984589771.webp 1100w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325361490d20abc59b3d26e777239e831936f1833-1-1713024217476984589771-300x169.webp 300w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325361490d20abc59b3d26e777239e831936f1833-1-1713024217476984589771-1024x576.webp 1024w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325361490d20abc59b3d26e777239e831936f1833-1-1713024217476984589771-150x84.webp 150w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325361490d20abc59b3d26e777239e831936f1833-1-1713024217476984589771-768x432.webp 768w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><figcaption id=\"caption-attachment-25602\" class=\"wp-caption-text\">According to the previous design, the central island of An Phu intersection will have a central tower according to the approved architectural plan. The tower&#039;s top height is 36m, equipped with a spiral staircase for maintenance work<\/figcaption><\/figure>\n<figure id=\"attachment_25603\" aria-describedby=\"caption-attachment-25603\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-25603 size-full\" src=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325385617c9cf205084a8c8fdb8219e4f82762469-1-1713024217487938194672.webp\" alt=\"\" width=\"1100\" height=\"619\" srcset=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325385617c9cf205084a8c8fdb8219e4f82762469-1-1713024217487938194672.webp 1100w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325385617c9cf205084a8c8fdb8219e4f82762469-1-1713024217487938194672-300x169.webp 300w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325385617c9cf205084a8c8fdb8219e4f82762469-1-1713024217487938194672-1024x576.webp 1024w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325385617c9cf205084a8c8fdb8219e4f82762469-1-1713024217487938194672-150x84.webp 150w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325385617c9cf205084a8c8fdb8219e4f82762469-1-1713024217487938194672-768x432.webp 768w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><figcaption id=\"caption-attachment-25603\" class=\"wp-caption-text\">The base of the tower represents the origin of the solidarity and consensus of the people, the synergy of many social sectors in the city combined with a desire to build a strong and prosperous city.<\/figcaption><\/figure>\n<figure id=\"attachment_25604\" aria-describedby=\"caption-attachment-25604\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-25604 size-full\" src=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763253615971fffd660587d7e775e4a45bd7d96ad0e-1-1713024217481702728394.webp\" alt=\"\" width=\"1100\" height=\"619\" srcset=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763253615971fffd660587d7e775e4a45bd7d96ad0e-1-1713024217481702728394.webp 1100w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763253615971fffd660587d7e775e4a45bd7d96ad0e-1-1713024217481702728394-300x169.webp 300w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763253615971fffd660587d7e775e4a45bd7d96ad0e-1-1713024217481702728394-1024x576.webp 1024w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763253615971fffd660587d7e775e4a45bd7d96ad0e-1-1713024217481702728394-150x84.webp 150w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763253615971fffd660587d7e775e4a45bd7d96ad0e-1-1713024217481702728394-768x432.webp 768w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><figcaption id=\"caption-attachment-25604\" class=\"wp-caption-text\">According to the planning, in the future there will be a metro train (elevated rail section) running through An Phu intersection<\/figcaption><\/figure>\n<figure id=\"attachment_25605\" aria-describedby=\"caption-attachment-25605\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-25605 size-full\" src=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325459456a88e75de08e37ec48099b12a6203f157-1-17130242174941746310841.webp\" alt=\"\" width=\"1100\" height=\"619\" srcset=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325459456a88e75de08e37ec48099b12a6203f157-1-17130242174941746310841.webp 1100w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325459456a88e75de08e37ec48099b12a6203f157-1-17130242174941746310841-300x169.webp 300w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325459456a88e75de08e37ec48099b12a6203f157-1-17130242174941746310841-1024x576.webp 1024w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325459456a88e75de08e37ec48099b12a6203f157-1-17130242174941746310841-150x84.webp 150w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z5276325459456a88e75de08e37ec48099b12a6203f157-1-17130242174941746310841-768x432.webp 768w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><figcaption id=\"caption-attachment-25605\" class=\"wp-caption-text\">The underpass extends through the Mai Chi Tho - Dong Van Cong intersection<\/figcaption><\/figure>\n<figure id=\"attachment_25606\" aria-describedby=\"caption-attachment-25606\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-25606 size-full\" src=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546335243cbe600d039ee85bec5b805169bfb06-1-1713024217498602099627.webp\" alt=\"\" width=\"1100\" height=\"619\" srcset=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546335243cbe600d039ee85bec5b805169bfb06-1-1713024217498602099627.webp 1100w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546335243cbe600d039ee85bec5b805169bfb06-1-1713024217498602099627-300x169.webp 300w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546335243cbe600d039ee85bec5b805169bfb06-1-1713024217498602099627-1024x576.webp 1024w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546335243cbe600d039ee85bec5b805169bfb06-1-1713024217498602099627-150x84.webp 150w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546335243cbe600d039ee85bec5b805169bfb06-1-1713024217498602099627-768x432.webp 768w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><figcaption id=\"caption-attachment-25606\" class=\"wp-caption-text\">The lane is wide, with trees planted along both sides and miniature landscapes<\/figcaption><\/figure>\n<figure style=\"width: 1100px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-25607 size-full\" src=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254858138c07955cdda30dd7190bd22f316621aa-1-17130242175031450472696.webp\" alt=\"\" width=\"1100\" height=\"619\" srcset=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254858138c07955cdda30dd7190bd22f316621aa-1-17130242175031450472696.webp 1100w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254858138c07955cdda30dd7190bd22f316621aa-1-17130242175031450472696-300x169.webp 300w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254858138c07955cdda30dd7190bd22f316621aa-1-17130242175031450472696-1024x576.webp 1024w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254858138c07955cdda30dd7190bd22f316621aa-1-17130242175031450472696-150x84.webp 150w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254858138c07955cdda30dd7190bd22f316621aa-1-17130242175031450472696-768x432.webp 768w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><figcaption class=\"wp-caption-text\">Two overpasses were built above, one of which is a Y-shaped bridge connecting Mai Chi Tho street (on the Hanoi highway side) and Luong Dinh Cua street with the expressway; One bridge turns right from the highway onto Mai Chi Tho street (Vo Nguyen Giap street side)<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_25609\" aria-describedby=\"caption-attachment-25609\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-25609 size-full\" src=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254707275eb5f7a9c191c14995148371017df48d-1-17130242175011461333266.webp\" alt=\"\" width=\"1100\" height=\"619\" srcset=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254707275eb5f7a9c191c14995148371017df48d-1-17130242175011461333266.webp 1100w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254707275eb5f7a9c191c14995148371017df48d-1-17130242175011461333266-300x169.webp 300w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254707275eb5f7a9c191c14995148371017df48d-1-17130242175011461333266-1024x576.webp 1024w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254707275eb5f7a9c191c14995148371017df48d-1-17130242175011461333266-150x84.webp 150w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z52763254707275eb5f7a9c191c14995148371017df48d-1-17130242175011461333266-768x432.webp 768w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><figcaption id=\"caption-attachment-25609\" class=\"wp-caption-text\">At the intersection of Mai Chi Tho street and Dong Van Cong street, two overpasses will be built connecting Mai Chi Tho street (Hanoi highway side) with Dong Van Cong street and vice versa. Giong Ong To bridge on Dong Van Cong street, Ba Dat bridge on Ho Chi Minh City - Long Thanh - Dau Giay highway will build new bridges next to the existing bridge<\/figcaption><\/figure>\n<figure id=\"attachment_25610\" aria-describedby=\"caption-attachment-25610\" style=\"width: 1100px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-25610 size-full\" src=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546709319c3aa3c1002b618be8dcf0aa7e74fa7-1-17130242174991601446577.webp\" alt=\"\" width=\"1100\" height=\"619\" srcset=\"https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546709319c3aa3c1002b618be8dcf0aa7e74fa7-1-17130242174991601446577.webp 1100w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546709319c3aa3c1002b618be8dcf0aa7e74fa7-1-17130242174991601446577-300x169.webp 300w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546709319c3aa3c1002b618be8dcf0aa7e74fa7-1-17130242174991601446577-1024x576.webp 1024w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546709319c3aa3c1002b618be8dcf0aa7e74fa7-1-17130242174991601446577-150x84.webp 150w, https:\/\/letienhung.com\/wp-content\/uploads\/2024\/05\/z527632546709319c3aa3c1002b618be8dcf0aa7e74fa7-1-17130242174991601446577-768x432.webp 768w\" sizes=\"(max-width: 1100px) 100vw, 1100px\" \/><figcaption id=\"caption-attachment-25610\" class=\"wp-caption-text\">The ground for construction of the central island, traffic lights and symbolic tower according to the approved architectural design plan<\/figcaption><\/figure>\n<p><i>Photo: Management Board of Investment and Construction Projects of Ho Chi Minh City Transport Works<\/i><\/p>\n<p>&nbsp;<\/p>\n<p>Source: Tuoi Tre Newspaper <em>(tuoitre.vn)<\/em><\/p>\n<div class=\"VCSortableInPreviewMode\"><\/div>","protected":false},"excerpt":{"rendered":"<p>An Phu intersection is a key project of Ho Chi Minh City built with a scale of 3 floors, including:<\/p>","protected":false},"author":15,"featured_media":25601,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-25598","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc-thi-truong"],"acf":[],"_links":{"self":[{"href":"https:\/\/letienhung.com\/en\/wp-json\/wp\/v2\/posts\/25598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/letienhung.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/letienhung.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/letienhung.com\/en\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/letienhung.com\/en\/wp-json\/wp\/v2\/comments?post=25598"}],"version-history":[{"count":0,"href":"https:\/\/letienhung.com\/en\/wp-json\/wp\/v2\/posts\/25598\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/letienhung.com\/en\/wp-json\/wp\/v2\/media\/25601"}],"wp:attachment":[{"href":"https:\/\/letienhung.com\/en\/wp-json\/wp\/v2\/media?parent=25598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/letienhung.com\/en\/wp-json\/wp\/v2\/categories?post=25598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/letienhung.com\/en\/wp-json\/wp\/v2\/tags?post=25598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}